Duration:

26 Weeks

Edward Edwards’ House

Edward Edwards’ House

MBL were appointed by JTRE London to undertake the full supply and installation of the blockwork package at Edward Edwards, 220 Blackfriars Road, London. The scope of works included facing blockwork to the B2 and B1 basement levels, incorporating associated ancillary works and complex Builders Work in Connection (BWIC) requirements, which were fully coordinated with JTRE and the M&E contractor. From Ground Floor to Level 15, MBL carried out blockwork to boundary walls, internal partition walls and intricate architectural brickwork features. In addition, MBL were responsible for the installation of the Type C Cavity Drain Membrane System to the B2 and B1 basement levels. These works included the application of Hydroflow HP and Hydroseal FX to the retaining walls, working closely with JTRE London and Premcrete to ensure technical compliance, seamless coordination and a high-quality finish throughout.

Blockwork

Edward Edwards’ House is a development comprising of 69 apartments across 15 floors + Ground and 2 No. Basement Levels.

Dedicated Teams
Delivering Quality On Site.

Our recruitment policy is based on full CSCS compliance, ensuring a fully qualified workforce committed to safety, quality, and professionalism on every project.

98%
of Projects Delivered On Programme
0 RIDDOR
Incidents

40+
CSCS Qualified Operatives
100+
Completed Residential, Commercial, & Industrial Projects

Areas Covered

Mega Brickwork covers the following locations and areas:

London
Home Counties
Bristol
South West
Locations Nationwide

Address

Suite 3, 9 Bridle Close, Kingston Upon Thames, KT1 2JW

Opening hours

Monday - Friday, 8:00am - 5:00pm

Contact Mega Brickwork

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.